Supplies were purchased to do connections ourselves as there had been previous experience with making these connections at Wallops. The primary focus of this trip would be making sure the grounding work was completed. With any time leftover and with Ray Greenwald visiting the site as well, the time delay measurement/calibration would be re-checked as the previously measured value did not make sense with elevation data being collected.
Blackstone Trip, Nov. 2016
By: ksterne on: Mon., Nov. 07, 2016 03:34 PM EST (7215 Reads)